Home / Facility & equipment
A plant built for starting materials.
From establishment we concentrated on developing a facility purpose-suited to producing key starting materials and bulk drugs. We publish the equipment schedule, because buyers should know exactly what their molecule will be made in.
The facility
- Integrated QC laboratory — well-equipped, in-house analysis for every batch.
- Safety as standard — protocols and training held to industry norms.
- Responsible effluent handling — through Government-authorised Effluent Treatment Plants.
- Export-ready packing — carried out to regulatory norms with documentation to match.
Quality & EHS
Quality is achieved through constant maintenance of standards: an ISO 9001:2015 certified system covering starting materials, bulk drug intermediates and recovery materials.
The eco-friendly commitment is a founding principle, not an add-on: effluent and residue leave the site only through authorised treatment routes, and operations are run to stay that way.
Process equipment schedule
Straight from the plant schedule: equipment, materials of construction and capacities.
| Equipment | ID | MOC | Capacity | Notes |
|---|---|---|---|---|
| Glass-Lined Reactor | GLR/01 | MSGL | 3 KL | Anchor agitator |
| Stainless Steel Reactors ×4 | SSR/01–04 | SS316 | 4–5 KL | |
| VAT | N.A. | N.A. | 5 KL | |
| Nutsche Filter | N.A. | N.A. | 0.8 KL | |
| Centrifuge | CF/01 | N.A. | 48″ | |
| Tray Dryer | TD/01 | N.A. | 96 trays | |
| Multi Mill | MM/01 | N.A. | N.A. | Milling & sizing |
| Chilling Plant | CP/01 | N.A. | 35 TR | |
| Cooling Tower | N.A. | N.A. | 150 TR | |
| Cooling Tower | N.A. | N.A. | 60 TR |
MOC = material of construction · KL = kilolitres · TR = tonnes of refrigeration